The following construction contracts are currently
out for bids or were recently opened. Although every effort is made
to provide the most current information available, the bid opening
dates shown may be changed by addendum at any time prior to bid opening.
For more information on the project, including how to purchase plans
and specifications, click on the "Notice Inviting Bids"
icon. Contact Metropolitan's Specifications
Desk if you have any questions.
* All PDF documents on this site require Adobe Acrobat Reader 4.0
or higher. If you do not have Adobe Acrobat Reader, or must upgrade
your version, you may download it for free from Adobe's
website. If you are using a dial-up modem, please note that many
of these documents are large in size and take a long time to open.
Use of software other than Adobe Reader may cause discrepancies from
the original documents. These risks will be assumed by the reader.
Out
for Bid
| SPEC
NO. |
PROJECT |
DOWNLOADABLE DOCUMENTS* |
APPROXIMATE
CONSTRUCTION
VALUE |
MANDATORY
PRE-BID CONFERENCE* |
BIDS
OPEN* |
|
RFQ 868
|
Urgent Pipeline Repair Services
|
|
|
|
10/02/2008 2:00 p.m.
|
|
M-2920
|
Foothill Feeder Cathoodic Protection
|
|
|
09/03/2008 10:00 a.m.
|
09/17/2008 2:00 p.m.
|
|
TBD
|
Upcoming Projects (Click on document at right to download list)
|
|
|
|
|
|
|
|
|
|
|
|
Bid Results
|
SPEC NO. |
PROJECT |
BIDS OPENED |
BID RESULTS |
| 1609 |
Olinda Pressure Control Facility Pavement Repair
|
07/24/2008 |
|
| 1616 |
Lake Skinner East Bypass Screening Structure Rehabilitation
|
07/15/2008 |
|
| 1575A |
Union Station Tenant Improvements
|
07/02/2008 |
|
| 1557 |
Joseph Jensen Water Treatment Plant Solids Thickeners 5 and 6
|
07/02/2008 |
|
| 1619 |
Robert A. Skinner Water Treatment Plant Solar Power Generation Facility
|
06/11/2008 |
|
| 1500 |
Robert B. Diemer Water Treatment Plant Oxidation Retrofit Project
|
06/06/2008 |
|
| 1590 |
Diamond Valley Lake - St. John Channel Repair and Modifications
|
05/20/2008 |
|
| M-2937 |
Foothill Feeder Fencing
|
05/01/2008 |
|