Metropolitan Water District of Southern California
about mwdnewsbusinessmember agenciesfinanceauditethicsjobscontactsearch

Current Construction Contract Opportunities

Last Updated: November 19, 2014 4pm

The following construction contracts are currently out for bids or were recently opened. Although every effort is made to provide the most current information available, the bid opening dates shown may be changed by addendum at any time prior to bid opening. For more information on the project, including how to purchase plans and specifications, click on the "Notice Inviting Bids" icon. Contact Metropolitan's Specifications Desk if you have any questions.

* All PDF documents on this site require Adobe Acrobat Reader 4.0 or higher. If you do not have Adobe Acrobat Reader, or must upgrade your version, you may download it for free from Adobe's website. If you are using a dial-up modem, please note that many of these documents are large in size and take a long time to open. Use of software other than Adobe Reader may cause discrepancies from the original documents. These risks will be assumed by the reader.


Out for Bid Bid Results Upcoming Projects

Out for Bid

SPEC NO.
PROJECT
DOWNLOADABLE DOCUMENTS*
APPROXIMATE CONSTRUCTION
VALUE
MANDATORY PRE-BID CONFERENCE*
BIDS OPEN*
1786
LADWP Lagoon Refurbishment

$2,700,000 to
$3,200,000
10/14/2014
9:00a.m.
12/09/2014
2:00p.m.
1524
Robert B. Diemer Water Treatment Plant Basin Rehabilitation

$55,000,000 to
$65,000,000
10/16/2014
10:00a.m.
12/02/2014
2:00p.m.
1777
F. E. Weymouth Water Treatment Plant Filter Rehabilitation

$40,000,000 to $50,000,000
12/11/2014
10:00a.m.
01/13/2015
2:00p.m.

Bid Results

SPEC NO.
PROJECT
BIDS OPENED
BID RESULTS
1753
Robert B. Diemer Water Treatment Plant East Filter Upgrades

11/19/2014
1765A
Santiago Creek Pressure Control Structure Roof Replacement

10/01/2014
1744A
Jensen Module 1 Filter Valve Replacement

09/30/2014
1707A
Henry J. Mills Water Treatment Plant Industrial Wastewater Handling Improvement

09/09/2014
1767
Coyote Creek Pressure Control Structure Roof Replacement

08/14/2014
1766
Coastal Junction Pressure Control Structure Roof Replacement

08/13/2014
1765
Santiago Creek Pressure Control Structure Roof Replacement

08/12/2014
1799
Furnishing Three 60-inch High-Performance Wafer-Type Butterfly Valves for Lakeview Pipeline

08/07/2014
1681
Gene Pumping Plant Storage Buildings Replacement

07/31/2014
1783
Furnishing Reservoir Bypass and Outlet Gates for F.E. Weymouth Water Treatment Plant

07/29/2014
1744
Jensen Module 1 Filter Valve Replacement

07/24/2014
1764
Perris Pressure Control Structure Roof Replacement

07/16/2014

 

Page updated: November 19, 2014 4pm